14. Sisak-Moslavina County

Population: 139.603
GDP per capita: 8.768,00 EUR
Unemployment rate: 14,70%
Average Gross Salary: 1.185,00 EUR
Average Net Salary: 896,00 EUR

Distances from traffic infrastructure

Road: 0,1 km
Highway: A3, 17 km (A3), 16 km (čvor Lekenik A11) km
Railway siding: 0,1 km
Sea port: Rijeka, 250 km
Airport: Franjo Tuđman Airport Zagreb, 51 km

Barutana Zone, Sisak Download as PDF

General information

Location (city/municipality) Sisak
Zone type Business zone
Size of the zone (m²) 130.987
Available land size (m²) 53.413
Construction purpose Manufacturing and services
Allowed construction density 0,6
Construction efficiency coefficient allowed 0,8
Allowed construction height (m) 15
Allowed noise level (at the border of the site, dB) Not forseen in physical plans
Diagram of the zone

Site specifications

Offered land lot size (m²) Dimensions of plot (width*height, m) Site description Title deed Public or private ownership Constraints on changing ownership title Land transfer Land sale/rent price (EUR*/m² / EUR*/m²/yearly)
46182 * Flat 1809_10 Public No encumbering rights Sale, rent according to the estimate
4512 * Flat 1809_12 Public No encumbering rights Sale, rent according to the estimate
2719 * Flat 1809_13 Public No encumbering rights Sale, rent according to the estimate

Infrastructure/energents capacity

Gas
Availability Yes
Electricity
Availability Yes
Water
Availability Yes
Sewage
Availability Yes
Water purifier Yes

Communal information

Communal contribution fee
Communal contribution for manufacturing (EUR*/m³) 6,63
Communal contribution for office spaces (EUR*/m³)
Communal contribution for services (EUR*/m³) 6,63
Redemption from paying communal contribution fee Yes
Communal contribution tax
Amount of communal contribution tax (EUR*/m²) Depending on the activity, from 0.045 EUR to 0.39 EUR
Redemption from paying communal contribution tax Yes, Amount of utility fee: KN = B x Kz x Kn x m2 B= EUR 0.066 Kz=0.8 Kn=4 (2-10, for metal industry 4) Amount of utility fee = EUR 0.21 x m2 Exemption from paying communal fees for production activity and new employment: 100% in the first year of work, 75% in the second, 50% in the third and 25% in the fourth.
Water contribution
Water contribution for business buildings (EUR*/m³)
Water contribution for manufacturing buildings (EUR*/m³) For production buildings 0.37 eur
Water contribution for open-space business buildings (EUR*/m²)
Water fee
Water regulation fee (EUR*/m²) The fee for water treatment is EUR 0.139/m2 per month for business premises intended for economic activities, EUR 0.04/m2 per month for business premises intended for production and service purposes and premises for research and testing, EUR 0.0265/m2 per month for open business premises spaces intended for economic and other activities, EUR 0.066/m2 per month for built and EUR 0.013/m2 per month for undeveloped construction land. The fee for water protection is paid in the amount of EUR 0.119/m3 for discharged wastewater and EUR 0.0000119/m3 for discharged wastewater used in the cooled process

Physical plans

County urban plan Yes
Municipal/City urban plan Yes
Master urban plan Yes
Urban development plan Created
Detailed urban plan Created

* average rate = 7.54

Ministry of Economy and Sustainable Development no legal responsibility for the accuracy or comprehensiveness of the data supplied in this database. Ministry of Economy and Sustainable Development accepts no liability for any direct, indirect, consequential or incidental damages or losses arising from use of the data collection.