Population:
139.603
GDP per capita:
8.768,00 EUR
Unemployment rate:
14,70%
Average Gross Salary:
1.185,00 EUR
Average Net Salary:
896,00 EUR
Road:
0,1 km
Highway:
A3, 17 km (A3), 16 km (čvor Lekenik A11) km
Railway siding:
0,1 km
Sea port:
Rijeka, 250 km
Airport:
Franjo Tuđman Airport Zagreb, 51 km
Location (city/municipality) | Sisak |
---|---|
Zone type | Business zone |
Size of the zone (m²) | 130.987 |
Available land size (m²) | 53.413 |
Construction purpose | Manufacturing and services |
Allowed construction density | 0,6 |
Construction efficiency coefficient allowed | 0,8 |
Allowed construction height (m) | 15 |
Allowed noise level (at the border of the site, dB) | Not forseen in physical plans |
Offered land lot size (m²) | Dimensions of plot (width*height, m) | Site description | Title deed | Public or private ownership | Constraints on changing ownership title | Land transfer | Land sale/rent price (EUR*/m² / EUR*/m²/yearly) |
---|---|---|---|---|---|---|---|
46182 | * | Flat | 1809_10 | Public | No encumbering rights | Sale, rent | according to the estimate |
4512 | * | Flat | 1809_12 | Public | No encumbering rights | Sale, rent | according to the estimate |
2719 | * | Flat | 1809_13 | Public | No encumbering rights | Sale, rent | according to the estimate |
Gas | |
---|---|
Availability | Yes |
Electricity | |
Availability | Yes |
Water | |
Availability | Yes |
Sewage | |
Availability | Yes |
Water purifier | Yes |
Communal contribution fee | |
---|---|
Communal contribution for manufacturing (EUR*/m³) | 6,63 |
Communal contribution for office spaces (EUR*/m³) | |
Communal contribution for services (EUR*/m³) | 6,63 |
Redemption from paying communal contribution fee | Yes |
Communal contribution tax | |
Amount of communal contribution tax (EUR*/m²) | Depending on the activity, from 0.045 EUR to 0.39 EUR |
Redemption from paying communal contribution tax | Yes, Amount of utility fee: KN = B x Kz x Kn x m2 B= EUR 0.066 Kz=0.8 Kn=4 (2-10, for metal industry 4) Amount of utility fee = EUR 0.21 x m2 Exemption from paying communal fees for production activity and new employment: 100% in the first year of work, 75% in the second, 50% in the third and 25% in the fourth. |
Water contribution | |
Water contribution for business buildings (EUR*/m³) | |
Water contribution for manufacturing buildings (EUR*/m³) | For production buildings 0.37 eur |
Water contribution for open-space business buildings (EUR*/m²) | |
Water fee | |
Water regulation fee (EUR*/m²) | The fee for water treatment is EUR 0.139/m2 per month for business premises intended for economic activities, EUR 0.04/m2 per month for business premises intended for production and service purposes and premises for research and testing, EUR 0.0265/m2 per month for open business premises spaces intended for economic and other activities, EUR 0.066/m2 per month for built and EUR 0.013/m2 per month for undeveloped construction land. The fee for water protection is paid in the amount of EUR 0.119/m3 for discharged wastewater and EUR 0.0000119/m3 for discharged wastewater used in the cooled process |
County urban plan | Yes |
Municipal/City urban plan | Yes |
Master urban plan | Yes |
Urban development plan | Created |
Detailed urban plan | Created |
* average rate = 7.54
Ministry of Economy and Sustainable Development no legal responsibility for the accuracy or comprehensiveness of the data supplied in this database. Ministry of Economy and Sustainable Development accepts no liability for any direct, indirect, consequential or incidental damages or losses arising from use of the data collection.