17. Virovitica-Podravina County

Population: 70.368
GDP per capita: 7.513,00 EUR
Unemployment rate: 15,70%
Average Gross Salary: 1.108,00 EUR
Average Net Salary: 848,00 EUR

Distances from traffic infrastructure

Road: 0 km - access to the zone is provided from county roads from the east and west km
Highway: A3, 85 km
Railway siding: 14 km
Sea port: , km
Airport: Osijek Airport, 95 km

Čađavica Industrial Zone Download as PDF

General information

Location (city/municipality) Čađavica
Zone type Business zone
Size of the zone (m²) 275.696
Available land size (m²) 275.696
Construction purpose Manufacturing and services
Allowed construction density >0,6
Construction efficiency coefficient allowed 1,2
Allowed construction height (m) 12 meters, some parts of the plant (silos, towers) could be up to 30 m
Allowed noise level (at the border of the site, dB)

Site specifications

Offered land lot size (m²) Dimensions of plot (width*height, m) Site description Title deed Public or private ownership Constraints on changing ownership title Land transfer Land sale/rent price (EUR*/m² / EUR*/m²/yearly)
1899 * Flat Public No encumbering rights Sale 1,034
77554 * Flat Public No encumbering rights Sale 1,034
9634 * Flat Public No encumbering rights Sale 1,034
14694 * Flat Public No encumbering rights Sale 1,034
4861 * Flat Public No encumbering rights Sale 1,034
86555 * Flat Public No encumbering rights Sale 1,034
80499 * Flat Public No encumbering rights Sale 1,034

Infrastructure/energents capacity

Gas
Availability Yes
Electricity
Availability Yes
Water
Availability Yes
Sewage
Availability No
Water purifier No

Communal information

Communal contribution fee
Communal contribution for manufacturing (EUR*/m³) 0,26
Communal contribution for office spaces (EUR*/m³)
Communal contribution for services (EUR*/m³) 0,26
Redemption from paying communal contribution fee No
Communal contribution tax
Amount of communal contribution tax (EUR*/m²) 0,074
Redemption from paying communal contribution tax No
Water contribution
Water contribution for business buildings (EUR*/m³)
Water contribution for manufacturing buildings (EUR*/m³)
Water contribution for open-space business buildings (EUR*/m²)
Water fee
Water regulation fee (EUR*/m²)

Physical plans

County urban plan Yes
Municipal/City urban plan Yes
Urban development plan Created
Detailed urban plan No obligation

* average rate = 7.54

Ministry of Economy and Sustainable Development no legal responsibility for the accuracy or comprehensiveness of the data supplied in this database. Ministry of Economy and Sustainable Development accepts no liability for any direct, indirect, consequential or incidental damages or losses arising from use of the data collection.