9. Međimurje County

Population: 106
GDP per capita: 11,48 EUR
Unemployment rate: 5,00%
Average Gross Salary: 1,19 EUR
Average Net Salary: 914,00 EUR

Distances from traffic infrastructure

Road: 1,1 km
Highway: A4, 20 km
Railway siding: 5,5 km
Sea port: Rijeka, 270 km
Airport: Zagreb International Airport – Franjo Tuđman, 110 km

Companies in the zone

Izolamont
Activity: Other construction installation works
Country of origin: Republic of Croatia
Parent company:
Company website:

MW Product
Activity: Machine processing of metal
Country of origin: Republic of Croatia
Parent company:
Company website: www.mwproduct.hr

Neugebauer
Activity: Production of other machines for general purposes
Country of origin: Federal Republic of Germany
Parent company:
Company website: http://www.klotzki-maschinen.de/

Arteferro Dohomont
Activity: Production of metal structures and their parts
Country of origin: Italian Republic
Parent company:
Company website: www.arteferro-dohomont.hr

Teracom
Activity: Construction of residential and non-residential buildings
Country of origin: Republic of Croatia
Parent company:
Company website: www.gradis.hr

Remenar MP
Activity: Activities of restaurants and other establishments for the preparation and serving of food
Country of origin: Republic of Croatia
Parent company:
Company website:

Economic Zone East Download as PDF

General information

Location (city/municipality) Goričan
Zone type Business zone
Size of the zone (m²) 215.053
Available land size (m²) 145.838
Construction purpose Manufacturing and services
Allowed construction density 0.4 for building plots up to 1 hectare 0.6 for building plots larger than 1 hectare
Construction efficiency coefficient allowed <=1,00
Allowed construction height (m) 8,5
Allowed noise level (at the border of the site, dB) 60 dB
Diagram of the zone
Scanned copy of cadastral plan extract with highlighted available lots

Site specifications

Offered land lot size (m²) Dimensions of plot (width*height, m) Site description Title deed Public or private ownership Constraints on changing ownership title Land transfer Land sale/rent price (EUR*/m² / EUR*/m²/yearly)
10000 * Flat Public No encumbering rights Sale 3,7
13608 * Flat Public No encumbering rights Sale 3,7
17492 * Flat Public No encumbering rights Sale 3,7
3000 * Flat Public No encumbering rights Sale 3,7
15552 * Flat Public No encumbering rights Sale 3,7

Infrastructure/energents capacity

Gas
Availability Yes
Electricity
Availability Yes
Water
Availability Yes
Sewage
Availability No
Water purifier No

Communal information

Communal contribution fee
Communal contribution for manufacturing (EUR*/m³) 1.06 EUR/m3, up to 2000m3 - 100% of the price in EUR/m3
Communal contribution for office spaces (EUR*/m³)
Communal contribution for services (EUR*/m³) From 2000 - 4000 m3 - 80% of the price in EUR/m3 - From 4001 to 8000 m3 - 60% of the price in EUR/m3 - Above 8000 m3 - the amount of 50% of the price in EUR/m3
Redemption from paying communal contribution fee Yes,  For an investor who has obtained the right to a preferential price based on the provisions of Article 8 of this Decision (reduction of the purchase price of land by 85%), the amount of the municipal contribution is reduced by 10%  For an investor who has obtained the right to a preferential price based on the provisions of Article 9 of this Decision (reduction of the land purchase price by 95%), the amount of the communal contribution is reduced by 20%
Communal contribution tax
Amount of communal contribution tax (EUR*/m²) 1.06 EUR/m3, up to 2000m3 - 100% of the price in EUR/m3 KN = 0.4 x coefficient of use x 1 x m2 a) business premises used for non-production activities (for example: trade and provision of services intended for the performance of activities (for example: supply of electricity, gas, air conditioning, construction, wholesale and retail shops, repair of motor vehicles and motorcycles, premises for providing accommodation other than hotels, premises for serving food and/or drinks, information and communications, financial activities, insurance activities, real estate business, professional activities, scientific and technical activities, administrative and auxiliary service activities, gambling, betting, trade and transport, personal services (hairdresser, watchmaker, shoemaker, tailor, etc.), catering, etc.) – 4.00 b) business premises for production activities – 3.00 c) business premises for agricultural activities and animal breeding (e.g. farms, greenhouses, greenhouses, warehouses for agricultural production, silos, etc.) - 1.00 d) open and closed warehouses for the purpose of carrying out trade activities, cold stores, catering facilities, freight terminals at GP Goričan and other business premises - 2.00 5. construction land used for carrying out a) non-production business activities - 0.40 b) production business activities – 0.30 c) business activities for agriculture and animal breeding – 0.10
Redemption from paying communal contribution tax Yes,  An investor who obtained a preferential land price based on the provisions of Article 8 of this Decision (reduction of the land purchase price by 85%), is exempted from paying 50% of the amount of the utility fee for a period of one (1) day, from the start of activities in the Zone,  An investor who obtained a preferential land price based on the provisions of Article 9 of this Decision (reduction of the land purchase price by 95%) is exempted from paying 50% of the amount of the utility fee for a period of two (2) years, from the start of activities in the Zone
Water contribution
Water contribution for business buildings (EUR*/m³) Croatian Waters
Water contribution for manufacturing buildings (EUR*/m³) Croatian Waters
Water contribution for open-space business buildings (EUR*/m²) Croatian Waters
Water fee
Water regulation fee (EUR*/m²) Croatian Waters

Physical plans

County urban plan Yes
Municipal/City urban plan Yes
Urban development plan Created
Detailed urban plan Created

* average rate = 7.54

Ministry of Economy and Sustainable Development no legal responsibility for the accuracy or comprehensiveness of the data supplied in this database. Ministry of Economy and Sustainable Development accepts no liability for any direct, indirect, consequential or incidental damages or losses arising from use of the data collection.