Population:
64.084
GDP per capita:
7.714,00 EUR
Unemployment rate:
11,90%
Average Gross Salary:
1.155,00 EUR
Average Net Salary:
877,00 EUR
Road:
km
Highway:
A3, 35 km
Railway siding:
1 km
Sea port:
, km
Airport:
Franjo Tuđman Airport Zagreb, 183 km
Spin Vallis
Activity:
Wood industry
Country of origin:
Parent company:
Company website:
http://www.spinvalis.hr/
Magma
Activity:
Production of metal structures
Country of origin:
Parent company:
Company website:
https://magma-pz.hr/
Location (city/municipality) | Požega |
---|---|
Zone type | Business zone |
Size of the zone (m²) | 441.900 |
Available land size (m²) | 278.534 |
Construction purpose | Manufacturing and services |
Allowed construction density | 0,5 |
Construction efficiency coefficient allowed | 1,8 |
Allowed construction height (m) | 15 |
Allowed noise level (at the border of the site, dB) | Not forseen in physical plans |
Gas | |
---|---|
Availability | Yes |
Electricity | |
Availability | Yes |
Water | |
Availability | Yes |
Sewage | |
Availability | Yes |
Water purifier | Yes |
Communal contribution fee | |
---|---|
Communal contribution for manufacturing (EUR*/m³) | Up to 1000 m³ - 2.65 EUR; 1001 – 5000 m³ - 3.32 EUR; 5001 – 10,000 m³ - 0.93 EUR; Over 10,000 m³ - 0.53 EUR |
Communal contribution for office spaces (EUR*/m³) | |
Communal contribution for services (EUR*/m³) | Up to 1000 m³ - 4.65 EUR; 1001 – 5000 m³ - EUR 1.33; 5001 – 10,000 m³ - 1.99 EUR; Over 10,000 m³ - 1.59 EUR |
Redemption from paying communal contribution fee | Yes, Users are exempted from paying the communal contribution 100% |
Communal contribution tax | |
Amount of communal contribution tax (EUR*/m²) | |
Redemption from paying communal contribution tax | Yes, Users are exempted from paying communal fees in the 1st year after the construction of the facility, they are exempted 100%, in the 2nd year after the construction of the facility, they are exempted from 80%, in the 3rd year after the construction of the facility, they are exempted from 40%, in the 5th year after the construction of the facility, they are exempted is 20% |
Water contribution | |
Water contribution for business buildings (EUR*/m³) | |
Water contribution for manufacturing buildings (EUR*/m³) | |
Water contribution for open-space business buildings (EUR*/m²) | |
Water fee | |
Water regulation fee (EUR*/m²) | Exempted from paying for water connection |
County urban plan | Yes |
Municipal/City urban plan | Yes |
Master urban plan | Yes |
Urban development plan | No obligation |
Detailed urban plan | No obligation |
* average rate = 7.54
Ministry of Economy and Sustainable Development no legal responsibility for the accuracy or comprehensiveness of the data supplied in this database. Ministry of Economy and Sustainable Development accepts no liability for any direct, indirect, consequential or incidental damages or losses arising from use of the data collection.