20. Zagreb County

Population: 301.206
GDP per capita: 10.769,00 EUR
Unemployment rate: 6,00%
Average Gross Salary: 1.353,00 EUR
Average Net Salary: 1.003,00 EUR

Distances from traffic infrastructure

Road: county road - 0.0 km; D1-0.3km km
Highway: A2, 1 km
Railway siding: Novi Dvori railway station - 0.0 km km
Sea port: Rijeka , 172 km
Airport: Zagreb International Airport – Franjo Tuđman, 32 km

Companies in the zone

LORSEL STROJEVI
Activity: consulting and sales of machines, tools and equipment for metal processing
Country of origin: Republic of Croatia
Parent company:
Company website: www.lorsel.com

DS SMITH UNIJAPAPIR CROATIA
Activity: recycling services
Country of origin: Republic of Croatia
Parent company:
Company website: www.dssmith.com

INKERPOR
Activity: production of porcelain products
Country of origin: Republic of Croatia
Parent company:
Company website: www.inkerpor.hr

ROCA CROATIA
Activity: production of sanitary ceramics
Country of origin: Kingdom of Spain
Parent company:
Company website: http://www.hr.roca.com/

Industrial Economic Zone Download as PDF

General information

Location (city/municipality) Zaprešić
Zone type Business zone
Size of the zone (m²) 1.034.400
Available land size (m²) 696.200
Construction purpose Manufacturing and services
Allowed construction density 0,6
Construction efficiency coefficient allowed production purpose: 2.0, business purpose: 2.4
Allowed construction height (m) production purpose: a maximum of 4 above-ground floors or 15.0 m from the ground to the cornice, - exceptionally, if the technological process requires it, part of the building (up to 50% of the total floor plan area) can be higher than that specified in the previous paragraphs (chimneys, silos and fig.), but not higher than 25.0 m, business purpose: maximum 5 floors above ground or 18.0 m from the ground to the cornice
Allowed noise level (at the border of the site, dB)
Diagram of the zone

Infrastructure/energents capacity

Gas
Availability Yes
Electricity
Availability Yes
Water
Availability Yes
Sewage
Availability Yes
Water purifier Yes

Communal information

Communal contribution fee
Communal contribution for manufacturing (EUR*/m³) 0,13
Communal contribution for office spaces (EUR*/m³) 13,27
Communal contribution for services (EUR*/m³) 13,27
Redemption from paying communal contribution fee Yes, 15% discount on one-time payment
Communal contribution tax
Amount of communal contribution tax (EUR*/m²) 0.31 for production activities, 0.56 for other activities
Redemption from paying communal contribution tax No
Water contribution
Water contribution for business buildings (EUR*/m³) 0,66
Water contribution for manufacturing buildings (EUR*/m³) 0,11
Water contribution for open-space business buildings (EUR*/m²) 0,19
Water fee
Water regulation fee (EUR*/m²) 0.13 for trade and services, 0.03 for manufacturing activities

Physical plans

County urban plan Yes
Municipal/City urban plan Yes
Master urban plan Yes
Urban development plan Not created, but there is obligation to create it
Detailed urban plan No obligation

* average rate = 7.54

Ministry of Economy and Sustainable Development no legal responsibility for the accuracy or comprehensiveness of the data supplied in this database. Ministry of Economy and Sustainable Development accepts no liability for any direct, indirect, consequential or incidental damages or losses arising from use of the data collection.