2. Brod-Posavina County

Population: 130
GDP per capita: 8.211,00 EUR
Unemployment rate: 14,50%
Average Gross Salary: 1.144,00 EUR
Average Net Salary: 872,00 EUR

Distances from traffic infrastructure

Road: Access road needs to be built.
Highway: A3, 0,5 km
Railway siding: 5 km
Sea port: Port of Rijeka, 350 km
Airport: Osijek, 80 km

‘Gospodarska proizvodno-poslovna’ Zone Zapad Download as PDF

General information

Location (city/municipality) Slavonski Brod
Zone type Business zone
Size of the zone (m²) 893.677
Available land size (m²) 893.677
Construction purpose Manufacturing and services
Allowed construction density 0.5-0.8, depending on the purpose
Construction efficiency coefficient allowed 1,0
Allowed construction height (m) 15-20, depending on the purpose
Allowed noise level (at the border of the site, dB) 60 dB
Diagram of the zone
Scanned copy of cadastral plan extract with highlighted available lots

Site specifications

Offered land lot size (m²) Dimensions of plot (width*height, m) Site description Title deed Public or private ownership Constraints on changing ownership title Land transfer Land sale/rent price (EUR*/m² / EUR*/m²/yearly)
1500 (2000) < * Flat Public No encumbering rights Sale, rent -

Infrastructure/energents capacity

Gas
Availability Yes
Electricity
Availability Yes
Water
Availability Yes
Sewage
Availability Yes
Water purifier Yes

Communal information

Communal contribution fee
Communal contribution for manufacturing (EUR*/m³) 3,98
Communal contribution for office spaces (EUR*/m³)
Communal contribution for services (EUR*/m³) 3,98
Redemption from paying communal contribution fee Yes, Fully or partially, in accordance with the Decision on the communal contribution
Communal contribution tax
Amount of communal contribution tax (EUR*/m²) 0.1-0.32, depending on the purpose
Redemption from paying communal contribution tax Yes, Fully or partially, in accordance with the Decision on the communal contribution
Water contribution
Water contribution for business buildings (EUR*/m³) 0,67
Water contribution for manufacturing buildings (EUR*/m³) 0,12
Water contribution for open-space business buildings (EUR*/m²) 0,20
Water fee
Water regulation fee (EUR*/m²) 0,04

Physical plans

County urban plan Yes
Municipal/City urban plan Yes
Master urban plan Yes
Urban development plan Created
Detailed urban plan Created

* average rate = 7.54

Ministry of Economy and Sustainable Development no legal responsibility for the accuracy or comprehensiveness of the data supplied in this database. Ministry of Economy and Sustainable Development accepts no liability for any direct, indirect, consequential or incidental damages or losses arising from use of the data collection.