10. Osijek-Baranja County

Population: 258.026
GDP per capita: 10.004,00 EUR
Unemployment rate: 14,90%
Average Gross Salary: 1.212,00 EUR
Average Net Salary: 913,00 EUR

Distances from traffic infrastructure

Road: km
Highway: A5, 34 km
Railway siding: There is none. The reception station in Našice is 3 km away km
Sea port: Port of Rijeka, 385 km
Airport: Osijek, 66 km

Našice Industrial Zone Download as PDF

General information

Location (city/municipality) Našice
Zone type Business zone
Size of the zone (m²) 657.600
Available land size (m²) 87.838
Construction purpose Manufacturing and services
Allowed construction density 0,6
Construction efficiency coefficient allowed 2
Allowed construction height (m) 18 (part of the building can be higher if the technological process requires it)
Allowed noise level (at the border of the site, dB) Not forseen in physical plans
Diagram of the zone

Infrastructure/energents capacity

Gas
Availability Yes
Electricity
Availability Yes
Water
Availability Yes
Sewage
Availability Yes
Water purifier Yes

Communal information

Communal contribution fee
Communal contribution for manufacturing (EUR*/m³) 0,13
Communal contribution for office spaces (EUR*/m³) 0,13
Communal contribution for services (EUR*/m³) 0,13
Redemption from paying communal contribution fee No
Communal contribution tax
Amount of communal contribution tax (EUR*/m²) 0,08
Redemption from paying communal contribution tax Yes, The investor is exempted from paying the utility fee until the end of the fifth year from the date of the start of the activity
Water contribution
Water contribution for business buildings (EUR*/m³) 1,75
Water contribution for manufacturing buildings (EUR*/m³) 0,32
Water contribution for open-space business buildings (EUR*/m²) 0,32
Water fee
Water regulation fee (EUR*/m²) 0.14 per month for business services and trade - tar. class 1, 0.04 per month for production activities - tariff class 2.

Physical plans

County urban plan Yes
Municipal/City urban plan Yes
Urban development plan No obligation
Detailed urban plan Created

* average rate = 7.54

Ministry of Economy and Sustainable Development no legal responsibility for the accuracy or comprehensiveness of the data supplied in this database. Ministry of Economy and Sustainable Development accepts no liability for any direct, indirect, consequential or incidental damages or losses arising from use of the data collection.