13. Šibenik – Knin County

Population: 96.624
GDP per capita: 11.325,00 EUR
Unemployment rate: 14,00%
Average Gross Salary: 1.186,00 EUR
Average Net Salary: 897,00 EUR

Distances from traffic infrastructure

Road: Access road needs to be built. Connection to the national road D8
Highway: A1, 41 km
Railway siding: - km
Sea port: Port of Split, 52 km
Airport: Split Airport , 32 km

Companies in the zone

PLODINE d.d.
Activity: Commercial, office
Country of origin: Republic of Croatia
Parent company: PLODINE d.d.
Company website: https://www.plodine.hr/

Oglavci production zone Download as PDF

General information

Location (city/municipality) Rogoznica
Zone type Business zone
Size of the zone (m²) 76.600
Available land size (m²) 53.820
Construction purpose Manufacturing and services
Allowed construction density 0,4
Construction efficiency coefficient allowed 0,8
Allowed construction height (m) business - trade (K2) - 10.0 m production, business (I2, K2), production, communal service (I2, K3), business - service (K1), production - communal service K3, - 7.0 m
Allowed noise level (at the border of the site, dB) 60 dB
Diagram of the zone

Site specifications

Offered land lot size (m²) Dimensions of plot (width*height, m) Site description Title deed Public or private ownership Constraints on changing ownership title Land transfer Land sale/rent price (EUR*/m² / EUR*/m²/yearly)
Several plots with a total usable area of ​​53,820 m2 * Flat Private No encumbering rights Sale 150

Infrastructure/energents capacity

Gas
Availability No
Electricity
Availability Yes
Water
Availability No
Sewage
Availability No
Water purifier No

Communal information

Communal contribution fee
Communal contribution for manufacturing (EUR*/m³) Commercial buildings for production I. Zone 7,98 €, II. Zone 3,98 €, III. Zone 0,66 €
Communal contribution for office spaces (EUR*/m³)
Communal contribution for services (EUR*/m³) Service activities other than tourist purposes I. Zone 9,31 €, II. Zone 7,98 €, III. Zone 2,66 €
Redemption from paying communal contribution fee No
Communal contribution tax
Amount of communal contribution tax (EUR*/m²) Article 9 and Article 13 of the Decision on communal fees ("Official Gazette of the Municipality of Rogoznica", No. 3/18)
Redemption from paying communal contribution tax No
Water contribution
Water contribution for business buildings (EUR*/m³) Zone A 1,11 €, Zone B 0,67 €, Zone C 0,34 €
Water contribution for manufacturing buildings (EUR*/m³) Zone A 0,20 €, Zone B 0,12 €, Zone C 0,04 €
Water contribution for open-space business buildings (EUR*/m²) Zone A 0,33 €, Zone B 0,20 €, Zone C 0,07 €
Water fee
Water regulation fee (EUR*/m²)

Physical plans

County urban plan Yes
Municipal/City urban plan Yes
Urban development plan Created
Detailed urban plan No obligation

* average rate = 7.54

Ministry of Economy and Sustainable Development no legal responsibility for the accuracy or comprehensiveness of the data supplied in this database. Ministry of Economy and Sustainable Development accepts no liability for any direct, indirect, consequential or incidental damages or losses arising from use of the data collection.