Population:
101.661
GDP per capita:
10.110,00 EUR
Unemployment rate:
6,00%
Average Gross Salary:
1.194,00 EUR
Average Net Salary:
902,00 EUR
Road:
0,1 km
Highway:
A4, 20,5 km
Railway siding:
0,5 km
Sea port:
Port of Rijeka, 215 km
Airport:
Franjo Tuđman Airport Zagreb, 60 km
TEHNOMONTAŽA d.o.o.
Activity:
production and assembly of metal structures
Country of origin:
Republic of Croatia
Parent company:
Company website:
WATROPUR d.o.o.
Activity:
mediation in the trade of machinery and industrial equipment
Country of origin:
Republic of Croatia
Parent company:
WATROPUR AG Švicarska
Company website:
Novoselmont d.o.o.
Activity:
Installation of industrial machines
Country of origin:
Republic of Croatia
Parent company:
Company website:
Cengiz insaat sanayi ticaret anonim sirketi
Activity:
Construction of railways
Country of origin:
Republic of Croatia
Parent company:
Company website:
Location (city/municipality) | Križevci |
---|---|
Zone type | Business zone |
Size of the zone (m²) | 451.000 |
Available land size (m²) | 132.000 |
Construction purpose | Manufacturing and services |
Allowed construction density | 0,1-0,5 |
Construction efficiency coefficient allowed | 1,5 |
Allowed construction height (m) | 11.5 for business activity, 8.5 for production activity (in certain cases even more possible) |
Allowed noise level (at the border of the site, dB) | Not forseen in physical plans |
Offered land lot size (m²) | Dimensions of plot (width*height, m) | Site description | Title deed | Public or private ownership | Constraints on changing ownership title | Land transfer | Land sale/rent price (EUR*/m² / EUR*/m²/yearly) |
---|---|---|---|---|---|---|---|
2500-10000 | * | Flat | Public | No encumbering rights | Sale, rent | 8.00, the initial price for obtaining the right to build is €0.033/m2/month |
Gas | |
---|---|
Availability | Yes |
Electricity | |
Availability | Yes |
Water | |
Availability | Yes |
Sewage | |
Availability | Yes |
Water purifier | Yes |
Communal contribution fee | |
---|---|
Communal contribution for manufacturing (EUR*/m³) | 2,70 |
Communal contribution for office spaces (EUR*/m³) | |
Communal contribution for services (EUR*/m³) | 2,70 |
Redemption from paying communal contribution fee | Yes, the communal contribution is reduced by 50% for buildings with a volume of 1,001-5,500 m3, for buildings with a volume of 5,501-10,000 m3 by 70%, and for buildings with a volume of 10,001 m3 and more by 90%. In enterprise zones, an additional discount of 10% is granted |
Communal contribution tax | |
Amount of communal contribution tax (EUR*/m²) | W points (0.046 EUR) x coefficient of zone (0.1 EUR) x coefficient of purpose (in the range of 1-8) x m2 |
Redemption from paying communal contribution tax | Yes, Utility fee reduction 100% in the first year, 75% in the second year, 50% in the third year and 25% in the fourth year. |
Water contribution | |
Water contribution for business buildings (EUR*/m³) | 0,67 |
Water contribution for manufacturing buildings (EUR*/m³) | 0,12 |
Water contribution for open-space business buildings (EUR*/m²) | 0,20 |
Water fee | |
Water regulation fee (EUR*/m²) | 0,04 |
County urban plan | Yes |
Municipal/City urban plan | Yes |
Master urban plan | Yes |
Urban development plan | Created |
Detailed urban plan | No obligation |
* average rate = 7.54
Ministry of Economy and Sustainable Development no legal responsibility for the accuracy or comprehensiveness of the data supplied in this database. Ministry of Economy and Sustainable Development accepts no liability for any direct, indirect, consequential or incidental damages or losses arising from use of the data collection.